Roehampton University, London

The multi-million-pound project involved the construction of student accommodation which now houses over 200 students in the grounds of the Grade II listed Devonshire House.
LV Power Solutions designed and installed the main 1600A form 4 type 6 Switchboard; complete with Split Lighting and Power Boards and Fully Metered Distribution Boards. All boards were pre-built with MCP and RCBO’s as per the client’s schedules.